How do you do capacity planning for a service?

Create a free account to save this page, take notes and track your progress. Sign in

Summary

Forecast demand (organic growth, launches, seasonal peaks), measure how much load each instance or resource can handle through load testing, and provision for peak plus a safety margin and the loss of a failure domain (N+1 or N+2, zone loss). Revisit regularly and automate scaling where possible.

Longer Answer

Steps: know the service's bottleneck resource and its saturation point (load tests, production measurements); model demand per business driver (requests per active user); plan for redundancy (survive losing a zone at peak); include lead times for things that cannot autoscale (database instances, quotas, reserved capacity, hardware). Watch cost: overprovisioning is also a failure. Track forecast accuracy and adjust.

Key Points

  • Forecast demand including peaks and launches.
  • Measure per-unit capacity with load tests.
  • Plan N+1 / zone loss.
  • Account for lead times and quotas.